Originally Posted by Samyeo
The specifications for one dimension of part of a ski binding are 1.50 plus or minus 0.002 centimeter. When the manufacturing facility, makes parts of this general size, the process has a standard deviation of measurement of 0.0015 centimeter. Suppose that the company wishes to produce 10,000 parts that are within the specifications and that it operates the process centered at 1.500 centimeters. All parts that are outside the specifications are scrapped, and the company will receive only $1.00 for each of them. It costs the company $36 to produce each part.
a. How many parts should the company start so that it can expect
10,000 good parts to be completed?
b. What would be the cost of internal failure in this situation?
:o