Results 1 to 2 of 2

Thread: I need help in understanding and solving this question

  1. #1
    Newbie
    Joined
    Oct 2018
    From
    Trinidad
    Posts
    1

    Post I need help in understanding and solving this question

    When an assembly machine is properly calibrated approximately 5% of the finished products are defective. Periodically the quality control engineer randomly selects 20 products at random and tests them. He will halt the production line to check (and reconfigure, if necessary) the calibration if any of the tested products are defective. Assuming that the machine is properly calibrated, what is the probability that production must be halted?
    Follow Math Help Forum on Facebook and Google+

  2. #2
    MHF Contributor

    Joined
    Apr 2005
    Posts
    20,032
    Thanks
    3160

    Re: I need help in understanding and solving this question

    The production will be halted when any the 20 test items are defective. The probability that any one of the items is NOT defective is 1- 0.05= 0.95. What is the probability that NONE of them are defective?. The probability at least one is defective is 1 minus that.
    Last edited by HallsofIvy; Oct 29th 2018 at 05:32 PM.
    Follow Math Help Forum on Facebook and Google+

Similar Math Help Forum Discussions

  1. Replies: 0
    Last Post: Apr 14th 2013, 08:46 AM
  2. understanding this question
    Posted in the Discrete Math Forum
    Replies: 2
    Last Post: Oct 29th 2010, 11:06 AM
  3. Replies: 1
    Last Post: Sep 8th 2010, 02:04 PM
  4. Replies: 8
    Last Post: Dec 6th 2009, 10:03 AM
  5. Help solving/ understanding (Cramers Rule)
    Posted in the Algebra Forum
    Replies: 1
    Last Post: May 17th 2007, 07:14 PM

Search Tags


/mathhelpforum @mathhelpforum